Work Breakdown Structure Example: How to Build a WBS That Actually Works?

Work Breakdown Structure

The worst work breakdown structure example I ever inherited was a 47-page document produced by a planning consultant at the start of a major fit-out programme. It was technically impressive. Level 1, level 2, level 3, level 4, work packages down to … Read more

Project Scheduling Techniques: CPM, Resource Levelling and Why Schedules Fail

Project Scheduling Steps , importance of project planning and scheduling process

A planning engineer I worked with on a large civils programme had a phrase he used every time someone handed him a schedule that looked optimistic: “Show me the logic.” Not the dates. Not the milestones. The dependency logic underneath. … Read more